Mirvac Leighton beach

 Client : Mirvac

  1. Leighton Beach

Approx 0ver 1000m2 of Exposed Aggregate

300m2 of structual concrete

Westcrete formed bondeck over suspended walkway areas , stairs and plinths. Areas were formed then reinforced by Westcrete then a structual concrete then the Exposed Aggregate was poured. Extra care was needed when exposing the aggregate due to limited areas to wash slurry to.

 

Contact The Team

Contact the friendly team at Westcrete to find out how we can help you get your next project under way.

Phone: 0407 766 424

A / PO Box 2314 Marmion WA. 6020

E / info@westcreteconstructions.com.au