Mirvac Leighton beach
- Leighton Beach
Approx 0ver 1000m2 of Exposed Aggregate
300m2 of structual concrete
Westcrete formed bondeck over suspended walkway areas , stairs and plinths. Areas were formed then reinforced by Westcrete then a structual concrete then the Exposed Aggregate was poured. Extra care was needed when exposing the aggregate due to limited areas to wash slurry to.